2022
The Group installed the first BESS Warehouse system with water-cooling technology (own patent). It finalized the sale of two permitted photovoltaic projects (at Ready to Build) with a combined capacity of 680 MW located in Nădab, Arad, to Enel Green Power (subsequently purchased by PPC Renewables).
2023
Monsson Trading reached 1.31 TWh traded annually. Until 2023, the Group expanded trading footprint in Sweden, Poland, Germany, Turkey, Finland, Austria, Greece, Italy and also New Zealand and South Africa.
2024
The Group transferred a photovoltaic portfolio with a total installed capacity of 1,250 MWdc (what is set to be the largest solar park in Europe) to Rezolv Energy (Actis-backed), an international infrastructure investor. Monsson connects first 24MWh BESS to Romanian grid.
2025
Monsson Group surpassed 7 GW in its development [text neclar, probabil „pipeline”], with over 5 GW of developed projects sold, more than 1,200 MW under operation and maintenance (O&M) and 200 MWh of energy storage capacity.
2026
Monsson Group created a renewable energy data center infrastructure of up to 1GW and started to build the Stage 1 – 6MW DC under construction in Mireasa Hybrid Power Plant where 50MW of wind and 35MW of PV generation have a behind-the-meter BESS of 120MWh.